Hegde V (Asst. Facility Manager) wrote:
Dear Residents ,
Greetings from Salarpuria Sattva !
The Work for linking the BWSSB cauvery water line will be started shortly as we received the “ Letter of Acceptance “ bearing letter issued no: BWSSB/EES/PB 504 2016-17 for linking the same to the main line.
Reference Document : BWSSB/EIC/ACE(M)-III/DCE(M)-I/TA(M)-III/897/16-17.
This is for your kind information please.
Thanks,
Greenage Facility Team
----------------------------------------------------------------------------------------------------------------------------------------------------
Dear Mr. Hegde,
The acceptance letter is related to sewerage connection fixing a contractor to install 200 MM pipes costing around 50 lacks. As it is seen it may take more time to complete the formalities to take up the work.
Your reference to water connection is not related in this contract. The chief engineer has sanctioned the water connection about six months ago. Some petty works only may be needed to connect the main line to our receiving tank. It only needs a follow up with the field engineers of BWSSB and water connection obtained early.
The delay in getting water supply is for want of follow up from SS management.
With regards
CHELLAPPAN S